Friday, April 8, 2011

Note Secret paint home improvement renovation process, "Ten traps".

<p> we all know, the decoration is a large, complex projects, bring some order to avoid unnecessary trouble, here are some of the trap clear package decoration, but also give you a reminder. .</ P> <P> <P> <p> wall decoration materials </ p> <p> phenomenon: the paint is the most common wall decoration materials, construction can be brushing, roller coating or spray .. .If workers in the construction are not serious or half-hearted, and often there will be slight color differences. .1 In particular, the paint is darker, but will face this problem. .</ P> <p align="left"> warmth Tip: Paint the need to add some water before use, deployment of a good paint to run out of time. .The same color of paint is also the best time brushing is completed. .If you need to repair the wall after construction, it is necessary to re-brushing over the entire wall. .1 </ p> <p align="center"> </ p> <p> water pipe </ p> <p> phenomenon: the construction team during the renovation, sometimes to the easy way, which will contain a large number of cement, .sand and concrete fragments of the construction waste into the sewers. .This is a direct consequence of serious sewer blockage, a kitchen and bathroom caused by poor water and running water. .Although some projects did not issue the final acceptance, but the problem of poor water is always there. .</ P> <p> warmth Tip: strict supervision of the construction team can not get sewer when the waste channel to use. .After construction is completed at sea, all of the basin, wash basin and bathtub filled with water, then drain the same time to see if the water is smooth, pipe leaks problem. .</ P> <p> wire connectors </ p> <p> phenomenon: the installation of electrical sockets, switches and lamps, wiring is not required by the construction. .Power consumption, especially in some of the larger consumers of water heaters, air conditioners and other appliances, causing switches, sockets and even burning fever, giving consumers a great economic losses. .</ P> <p> warmth Tip: In the construction supervision of electrical strict accordance with the rules for construction, in all switches, sockets installed, be sure to actually use these sites to see whether there is a hot phenomenon. .</ P> <p> tiles paving </ p> <p> phenomenon: Laying ceramic tile is a more technical process. .If the workers cut corners, it is most prone to hollowing tiles, uneven joints and other issues on the other, a paving tile adhesive with cement and also pay attention to, if the ratio of loss and other issues will also appear unreasonable. .</ P> <p> warmth Tip: According to the Beijing Municipal Construction Committee issued a "family room decoration project quality acceptance criteria", called for paving tiles should be smooth and firm, a clear pattern, no dirt and paste marks, surface color is consistent .joints uniform, crack-free plate, off angle and the lack of edge, local hollowing not exceed 5% of the total. .</ P> <p> wall tick slot </ p> <p> phenomenon: Buried pipelines to be slotted in the walls and the ground to be buried pipelines. .Small number of workers during the slotting operation brutal construction, not only destroyed the building load-bearing structure, there could have damaged other nearby lines. .</ P> <p> warmth Tip: Before construction, and construction of the captain once again to confirm the direction and location of the pipeline. .For different wall structure, the requirements are not the same slot. .Load-bearing walls is not allowed inside the housing slot, and with the insulation layer of the wall in the slot, the result is easy to crack the surface, while on the ground slot, a more careful not to damage the floor, to the downstairs .Household cause trouble. .</ P>.

No comments:

Post a Comment