Sunday, March 27, 2011

Alert: clean package decoration paints and other building materials during the "Ten traps".

<p> now is a large, complex renovation project, bring some order to avoid unnecessary trouble, here are some of the trap clear package decoration, but also give you a reminder. .</ P> <P> <P> <p> wall painting </ p> <p> phenomenon: the paint is the most common wall decoration materials, construction can be brushing, roller coating or spray .. .If workers in the construction are not serious or half-hearted, and often there will be slight color differences. .Especially the darker the paint, it will face this problem. .</ P> <p> warmth Tip: Paint the need to add some water before use, deployment of a good paint to run out of time. .The same color of paint is also the best time brushing is completed. .If you need to repair the wall after construction, it is necessary to re-brushing over the entire wall. .</ P> <p> water pipe </ p> <p> phenomenon: the construction team during the renovation, sometimes to the easy way, which will contain a large number of cement, sand and concrete fragments of the construction waste into the sewers. .This is a direct consequence of serious sewer blockage, resulting in the kitchen and bathroom and running water due to poor water. .Although some projects did not issue the final acceptance, but the problem of poor water is always there. .</ P> <p> warmth Tip: strict supervision of the construction team can not get sewer when the waste channel to use. .After construction is completed at sea, all of the basin, wash basin and bathtub filled with water, then drain the same time to see if the water is smooth, pipe leaks problem. .</ P> <p> wire connectors </ p> <p> phenomenon: the installation of electrical sockets, switches and lamps, wiring is not required by the construction. .Power consumption, especially in some of the larger consumers of water heaters, air conditioners and other appliances, causing switches, sockets and even burning fever, giving consumers a great economic losses. .</ P> <p> warmth Tip: In the construction supervision of electrical strict accordance with the rules for construction, in all switches, sockets installed, be sure to actually use these sites to see whether there is heat phenomenon. .</ P> <p> tiles paving </ p> <p> phenomenon: Laying ceramic tile is a more technical process. .If the workers cut corners, it is most prone to hollowing tiles, uneven joints and other issues on the other, paving tile adhesive with cement and also pay attention to, if the ratio of loss and other issues will also appear unreasonable. .</ P> <p> warmth Tip: According to the Beijing Municipal Construction Committee issued a "family room decoration project quality acceptance criteria", called for paving tiles should be smooth and firm, a clear pattern, no dirt and paste marks, surface color is consistent .joints uniform, crack-free plate, off angle and the lack of edge, local hollowing not exceed 5% of the total. .</ P> <p> wall tick slot </ p> <p> phenomenon: Buried pipelines to be slotted in the walls and the ground to be buried pipelines. .Small number of workers during the slotting operation brutal construction, not only destroyed the building load-bearing structure, there could have damaged other nearby lines. .</ P> <p> warmth Tip: Before construction, and construction of the captain once again to confirm the direction and location of the pipeline. .For different wall structure, the requirements are not the same slot. .Load-bearing walls is not allowed inside the housing slot, and with the insulation layer of the wall in the slot, the result is easy to crack the surface, while the slot in the ground, but be careful not damage the floor, to the downstairs tenants .cause trouble. .</ P> <p> joint modification </ p> <p> phenomenon: in some walls and doors, the windows of the butt joints, and two different color paint docking place, but also where workers are often perfunctory .. .You will often see the latex paint at each other with the butt mixed problems arise at the seams. .</ P> <p> warmth Tip: For treatment of joints is very important, you must carefully supervise the construction workers. .If there are two colors in the wall paint when the relative received, must be in the construction of a color in the edge of the tape, and then brushing in a different color of its paint, so as long as construction is completed .After the tear tape, the joints can be very neat to the. .</ P> <p> wire intubation </ p> <p> phenomenon: in the home decoration and construction, almost all wires are worn in the PVC tube, Buried within the walls. .So into the PVC pipe through wires, consumers can not see, but more difficult to replace. .If workers do not seriously in the operation would lead wires kink in the tube, causing electrical hazards. .If a worker intends to cut corners, will use wire with a connector or with a few wires through a PVC tube. .</ P> <p> warmth Tip: consumers buy their own best lines, and supervision of workers to operate in the field, installed after the power test. .In addition, consumers must let the team leave a renovation project "pipeline map." .Just as an electrician to wire buried walls, to make these walls numbered and draw floor plans, and then use a pen to draw the wire and the specific location, specify the distance slab, under the wall from the ground and the adjacent position, .In particular the joint position of the pipeline should be marked, so that once the fault lines at once to find the location. .</ P> <p> small surface treatment </ p> <p> phenomenon: the so-called "small side", that is, some consumers do not see the eyes, but not too little attention to places such as the upper edge of door ., below the sill plate, heating the inside cover and other places, some of the workers here will cut corners, even without any treatment. .</ P> <p> warmth Tip: Remember that any object are all six planes in the test project quality Do not ignore any detail </ p> <p> ground leveling </ p> <p> phenomenon .: Some housing is not enough flat ground, in the decoration need to re-leveling. .If workers are not careful enough or intentional shoddy, will result in "more to find the more inequality" problem, and the construction of cement mortar used in the ground will greatly increase the load to the floor, body safety and security. .</ P> <p> warmth Tip: Before leveling the ground, you must first do a good job handling the basement floor, and then leveling the ground with cement mortar. .After the cement dried, with a dedicated spirit level to determine the flatness of the ground, and then the next step of the construction. .</ P> <p> substrate processing </ p> <p> phenomenon: the brushing latex paint, paving tiles, be sure to do a good job base treatment. .Some workers in the construction of shoddy work in this area, ranging from causing the wall is not flat, after brushing paint color, while in paint color off, or tile paste is not strong. .</ P> <p> warmth Tip: Pavement in ceramic tile, you should pay attention to, ceramic tile can not be directly laid on lime mortar, lime paste, paper, lime cream bars, hemp and lime paint surface, and .primary surface treatment is to clean and only after laying. .Tile and adhesive used between the base slurry, should be strictly in accordance with the proportion of the construction standards and deployment of Use label cement, adhesive plastic materials and can not deploy. .</ P>.

No comments:

Post a Comment